The Vinon-sur-Verdon photovoltaic solar park, with a capacity of 4.2 megawatts (MW), has now started electricity production. Solaire Durance, a joint venture between Caisse des Dépôts and Solairedirect, developed the project.

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google