We have a Physics controlled assessment/ISA tomorrow and I need to fill the sheet out.
The hypothesis is ‘ The output voltage from a solar cell depends on the area of the solar cell exposed to light.’

the context given was: ‘A company wishes to market a solar powered mobile phone. The solar cell has to generate enough power but be small enough for the phone’.

My method is to test different sized Solar Panels to see how much output they create.
We were given a sheet, which we have to fill out which has things like the method, equipment, etc.

There is a box which says
‘risk assesment issues’
and another which says ‘Relating the investigation to the context’

What do these mean and what could I put in them? Please help I need this for tomorrow, it’s important and I want to do well :S
thankyou in advanced<3

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google